%20%D0%BA%D0%BE%D0%BF%D0%B8%D1%8F%20(1)_1740035736.png)
The British Management University is proud to announce the completion of its ultra-modern campus, covering a total area of 44,000 square meters on a 5-hectare site. Built in under two years, this project was made possible through the expertise of over 20 engineers and specialists, alongside a dedicated workforce of more than 1,500 construction workers. The project utilized over 50 units of specialized equipment, employing 29,200 cubic meters of concrete, 4,700 tons of reinforcement, and 250 tons of metal structures.
All construction materials have successfully passed seismic resistance testing and are designed for enhanced energy efficiency and environmental sustainability. The campus features advanced Italian solar panels with a capacity of 150 kWh, a Japanese Daikin ventilation system, and a German Wiesmann heating system. Security is a priority, with more than 450 CCTV cameras monitoring the premises 24/7.
To enhance the campus's unique landscape design, 1,057 trees and 4,000 seedlings were specially imported from Turkey and Italy. The total cost of the project was $40 million, resulting in an academic building with a total area of 37,500 square meters, capable of comfortably accommodating 5,000 students.
Our purpose-built campus is equipped with state-of-the-art facilities designed to enhance the learning experience for all students:








